Search found 502 matches
Thanks for updating everyone Tom. As mentioned in our conversation that was quoted, my free time has diminished over the years. If everything had rolled as smoothly as I had hoped, I'm sure we would have all been sitting on nice seats. Unfortunately, it's a full time job to chase down all the odds a...
Thank's again to Tom who has be incredibly helpful in this entire project with providing measurements when needed. Using his latest batch of references, I've figured out where our current problem lies. It seems that the width of the seat has been shrunk down by about 1/2" consistently down the entir...
Well, I thought we were at the light at the end of the tunnel. I'm having trouble fitting the pan down over the frame. It bumps into parts of the frame around the middle of the seat leaving a 1/4" gap between the mounting brackets and the pan itself. I think somewhere among the passing between the f...
Ok, I know it's been slow going...at least it's winter though :-) Anyway, all of the metal work has been squared away and everything seems to be fitting well. I did a quick mock-up of the seat on my bike to test fit everything and it all seems to work well. http://i3.photobucket.com/albums/y79/cyclo...
Well, after a long wait, ALL of the metal parts are finally in! This means I have everything to start assembling seats. I have a few things I'm finishing up before the thanksgiving break so I won't be able to have one out before then, but it looks like we'll all have christmas presents at the least ...
Well, as everyone's probably noticed, the metal shop is running behind. I'm basically a small fish in a big pond with them as they're working me a favor with the few pieces I'm having made. They normally do large volume work. I was told UPS had an order with them that was holding us up. Anyway, they...
Ok, finally recieved a proof from the steel shop that's cutting the butt plate. I've finalized the order with them and should hopefully get these things in in the next few weeks. After that, all the components will be in place and I can crank out the first one. I already have two final fiberglass se...
|